news El Sudcaliforniano 2026-07-07

Audit Ordered for Metro Line 2 Remodeling to Check for Overcosts

An audit has been ordered for the remodeling works of Metro Line 2 to determine if there were any cost overruns. This move aims to ensure transparency in resource allocation.

Support Your Local Toad

The Pesky Toad is free and ad-light. If you find it useful, toss a few pesos in the tip jar to help keep the servers running and the satire flowing.

$

MXN · Minimum $10