news
El Sudcaliforniano
2026-07-07
Audit Ordered for Metro Line 2 Remodeling to Check for Overcosts
An audit has been ordered for the remodeling works of Metro Line 2 to determine if there were any cost overruns. This move aims to ensure transparency in resource allocation.