Water Main Break Repair in Iztapalapa Completed After 50 Hours
Repairs on a major water main in Iztapalapa have concluded after more than 50 hours of intensive work. The large-diameter pipe rupture had caused significant disruption.
Fueron más de dos días de trabajo para reparar la tubería de más de 120 centímetros de diámetro