The Pesky Toad Logo

The Pesky Toad

The Pescadero Perspective

This story has rotated off the live feed but the permalink stays available for sharing and search.

world Cbc World 2026-03-26

Trans Mountain Pipeline to Reach Full Capacity Amid Global Energy Crisis

The Trans Mountain pipeline system is expected to operate at full capacity in April and May due to energy disruptions in the Middle East, amid a global energy crisis.


<img alt="" height="349" src="https://i.cbc.ca/ais/1.4767792,1532997070000/full/max/0/default.jpg?im=Crop%2Crect%3D%280%2C0%2C1919%2C1079%29%3BResize%3D%28620%29" title="A pipeline marker for the Trans Mountain pipeline as it passes by the Coldwater River and Coldwater Reserve in B.C." width="620" /><p>The Trans Mountain oil pipeline system is expected to operate at full capacity in April and into May as a result of energy disruptions in the Middle East.</p>

Support Your Local Toad

The Pesky Toad is free and ad-light. If you find it useful, toss a few pesos in the tip jar to help keep the servers running and the satire flowing.

$

MXN · Minimum $10