news Bcs Noticias Lapaz 2026-09-19

CFE Adds 128 MW to Boost Power Supply and Meet Growing Electricity Demand in BCS

The Federal Electricity Commission deployed five mobile turbo-gas units to Los Cabos and Cabo Bello, adding 128 MW of generating capacity. This infrastructure upgrade aims to stabilize the isolated Baja California Sur power grid against surging energy demands.

Support Your Local Toad

The Pesky Toad is free and ad-light. If you find it useful, toss a few pesos in the tip jar to help keep the servers running and the satire flowing.

$

MXN · Minimum $10